In this build challenge series in Trainz 22, we are tackling this route one square at a time, doing things completely fictional and free-form to my liking, quite literally one square at a time. This is a great way for Trainz modelers to understand the depth you can build in a small area. So come along and enjoy the new build.
Curated by: DannyBTrainz (21 videos)
Hello all and welcome back to the One Square at a Time series here in Trainz 22 on DannyBTrainz. In today's episode, we are finally capping off the lower end of the Rockville hump in CSX's yard. In addition, we begin the area for the intermodal facility and other industries for the Baldwin & Company Railroad Corporation to work alongside CSX. We also establish a transfer track for BCRC to utilize as well. That will all be connected in later episodes, but for now, I can't wait to showcase this build. Let me know your thoughts of today's section in the comments below! See more here: https://www.youtube.com/@DannyBTrainz?sub_confirmation=1 My name is Danny B, and I have an enjoyment of railroads, their history, their present day status, watching trains, and I get to express that enjoyment through my n-scale model railroad and more specifically, building a larger model through the video game, Trainz 22. I am also the owner of DannyBTalks on YouTube, a channel where I discuss things that I find interesting in the world of NASCAR racing, from its past, present, and future. Be sure to check out that channel if you are interested in racing too. http://youtube.com/DannyBTalks Be sure to follow me on Twitter as well at https://twitter.com/DannyBTalks