OFF-GRID KENTUCKY CABIN BUILD
Watch and track your favorite playlist.
Curated by:
Bluegrass State of Mind (68 videos)
Tracks in this Playlist
PREPPING THE CABIN PORCH FOR CABLE RAILING | EPISODE 70
THE BOBCAT IS BACK!! | THE TRIM IS DONE | THE WEATHER IS PERFECT!!
WE GOT OUR NEW FLOOR DOWN IN THE CABIN!! EPISODE 68
MORE TRIM | BURNING SCRAP WOOD EPISODE 67
FINISHING THE INTERIOR WITH BLACK TRIM | A NEW BLIND AND THERMOMETER
KENTUCKY LAKE CABIN, THE LAST OF THE TONGUE AND GROOVE | EPISODE 65
LAST SET OF STEPS COMPLETE AT THE LAKE CABIN | MORE TONGUE AND GROOVE
SWELTERING HEAT AT THE LAKE CABIN | MORE TONGUE AND GROOVE AND STEP FOOTINGS
FINISHING THE TONGUE AND GROOVE CEILING AND ENJOYING A SUMMER NIGHT AT THE LAKE CABIN
INSTALLING TONGUE AND GROOVE AND WAFER LIGHTS AT THE CABIN
4TH OF JULY AT THE CABIN | LIMB LINES FOR CATFISH | WATERMELON SALAD !!!
GREEN LOO GL 90 COMPOSTING TOILET | FULL INSTALL | AWESOME COMPOSTING OPTION
FISHING AND COOKING AT THE LAKE CABIN | EPISODE 57
RAINY WEEKEND AT THE LAKE CABIN | GOOD FOOD AND INSIDE WORK
LAKE CABIN INTERIOR FINISHES | I FINISHED THE BATHROOM FRAMING
SPENDING A COOL MAY NIGHT AT THE CABIN | GETTING STARTED ON THE INTERIOR
TYING UP SOME LOOSE ENDS | PREPPING TO START THE INTERIOR
Another Peaceful Night at the Cabin | We Got an Air Conditioner and Finished the Dock Steps
EXCAVATION WORK AT THE CABIN | IT WAS A LITTLE SKETCHY
WE SPENT OUR FIRST NIGHT AT OUR OFF-GRID LAKE CABIN | EPISODE 50
METAL SIDING IS FINISHED | PORCH LIGHTS AND A BED
FINISHED THE METAL ON THE FRONT AND STARTED BUILDING STEPS FROM THE DOCK | EPISODE 47
METAL GOING UP ON THE FRONT OF THE CABIN | EPISODE 46
INSTALLING STEEL SIDING ON MY CABIN | WE ALMOST DIDN'T MAKE IT OUT!!! | EPISODE 45
CAN A NOVICE WIRE A CABIN??? | FIRST VISIT SINCE THE ICE STORM, SURVEYING THE DAMAGE
OFF-GRID CABIN PORCH IN 12 MINUTES | EPISODE 43
BATHROOM IN A BOX, CIRCUIT PANEL AND A GROUNDING ROD | EPISODE 42
ALMOST INSULATED | EPISODE 41
INSULATING BEFORE THE NEXT COLD SNAP | ROUGHING IN ELECTRICAL FOR LIGHTS | EPISODE 40
LAKE CABIN FOUNDATION IN UNDER 10 MINUTES | EPISODE 39
BATHROOM FRAMING, MORE BIRD BLOCK SCREENING AND ELECTRICAL | EPISODE 38
ROUGHED IN ELECTRICAL CIRCUIT AND RAFTER VENTS COMPLETE | EPISODE 37
PORCH STEPS AND A NEWLY PAINTED DOOR | EPISODE 36
FRONT DOOR INSTALLATION | EPISODE 35
A STRANGE way to install windows | Roof Venting | EPISODE 34
INSTALLING A METAL ROOF ON MY OFF GRID CABIN | EPISODE 33
FURRING STRIPS, A FLAT TIRE AND A BOAT RIDE | EPISODE 32
INSTALLING LARGE WINDOWS IN PIECES | EPISODE 31
ROOFING FELT AND PORCH STEPS | EPISODE 30
HOUSE WRAP AND ROOF SHEATHING | EPISODE 29
RAFTERS AND MORE SHEATHING | EPISODE 28
END WALLS AND RATTLE SNAKES | EPISODE 27
FRONT WALL IS UP, OFF-GRID CABIN | EPISODE 26
FIRST WALL UP ON THE CABIN | EPISODE 25
FRONT PORCH COMPLETE FOR THE LAKE CABIN | EPISODE 24
GIANT HICKORY GOES DOWN!! PORCH JOISTS FOR THE CABIN COMPLETE!!| EPISODE 23
PORCH POSTS AND RIM JOIST | EPISODE 22
AWESOME NEW WINCH!! PORCH FOOTINGS COMPLETE | EPOSODE 21
MY LAKE CABIN COST SO FAR | EPOSODE 20
CABIN SUBFLOOR INSTALLATION | EPISODE 19
JOIST BLOCKING AND PORCH FOUNDATION | EPISODE 18
CABIN FLOOR JOIST INSTALL | EPISODE 17
I COMPLETED LATERAL BRACING | BOAT DISASTER | EPISODE 16
INSTALLING LATERAL BRACING | EPISODE 15
THE CABIN RIM JOIST IS COMPLETE | EPISODE 14
INSTALLING A DOUBLE RIM JOIST ON MY OFF-GRID CABIN | EPISODE 13
CABINS POSTS ARE INSTALLED!! | EPISODE 12
CABIN FOOTINGS ARE COMPLETE!!! | EPISODE 11
CABIN FOOTINGS AND POSTS, GETTING CLOSER | EPOSODE 10
I GOT MY CORNER POSTS SET FOR THE CABIN!!! | EPISODE 9
BUILDING A PRIVATE DOCK IN THE MIDDLE OF NOWHERE PART 2 | EPISODE 8
BUILDING A PRIVATE DOCK IN THE MIDDLE OF NOWHERE | EPISODE 7
DIGGING AND POURING FOOTERS FOR OUR OFF-GRID CABIN | EPISODE 6
FIRST FOOTINGS FOR OUR OFF-GRID CABIN | EPOSODE 5
IT TOOK A JACKHAMMER TO DIG THESE FOOTINGS | EPISODE 4
BREAKING GROUND ON OUR LAKE CABIN | EPISODE 3
CABIN FOUNDATION LAYOUT | EPISODE 2
WE BOUGHT AN OFF-GRID LAKE LOT | EPISODE 1